![01](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/01.jpg)
As we get closer to completion of our new Waterfall House, we want to share some behind the scenes photos from the past couple of months of construction.
![02](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/02.jpg)
The pool substructure with a view of the hills surrounding the house.
![03](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/03.jpg)
Installation of the pool tile. With a 360 degree negative edge, we’re not spoiling the view.
![04](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/04.jpg)
Interior door pocket wall.
![06](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/06.jpg)
Installation of the custom steel entry door, designed by Kevin Gallaugher at Dick Clark Architecture.
![07](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/07.jpg)
Standing seam roof installation.
![08](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/08.jpg)
![09](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/09.jpg)
Shower tile installation.
![10](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/10.jpg)
Installing vertical grain cedar on the overhang and in the carport.
![11](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/11.jpg)
![12](http://jonlucebuilder.com/wordpress/wp-content/uploads/2013/10/12.jpg)
Found a skateboard in the dumpster and took it for a ride.